2015年8月24日星期一

Installation Drawing of Deviation Switch Cover

 According to the location of deviation switch, please install and center the drilled cover, then put the sealing strip on the cover open point flatly according to the height of the switch box cover , then install the switch box cover with 12-Φ5 rivet.

Installation drawing of deviation switch cover .


deviation-switch-conveyor-cover-drawing

  -------------------------------------------------------------------------
Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyor, and Vibrating screenBucket elevatorScrew conveyorScraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. our goal is "be the future global leader of mining machinery industry". have any questions, please contact us without any hesitation. 

Henan Pingyuan Mining Machinery Co., Ltd.
Address: 298 Yellow River Road, Xinxiang City, Henan Province, China.
Tel: +86 373 579 9198Fax: +86 373 507 1699Email Address: info@pkmachinery.com
Official Website: http://www.pkmachinery.com/

没有评论:

发表评论